Risk is defined as the potential for harm to personnel. Mathematically it is described as:
The total risk is thus a summation of the all the individual risks applicable.
AROS 3D calculates the risks for specific hazardous material releases and other standard type risks.
The release of a hazardous material on a site may result multiple consequences and thus multiple risks to personnel.
AROS 3D calculates the following hazardous material release risks:
In addition to the risks inherent to the release of hazardous materials there may also be additional risks related the specifics of a site with regard to its location, environment, operating strategy, design limits etc..
AROS 3D calculates the following hazardous material release risks:
AROS 3D undertakes risk calculations based upon physical 3 dimensional layout, hazardous material release characteristics, safety systems activation, personnel distribution, escalation rule-sets and standard risks. Examples of the calculated output data is shown in the screen shots below.
Immediate risk.
Muster risk.
Transport risk.
AROS 3D has the advanced functionality to display charts of the calculated data as per the users requirements.The chart below shows the area specific individual risk per annum and the contribution from each of the hazardous material releases.
Advanced functionality for displaying and analysing calculated data:
AROS 3D is designed to eliminate the "black box" type approaches of hidden calculations and instead includes functionality for open interrogation of calculated data and if necessary exporting of data for external analysis.